The action was based on two inspections performed at the Point Beach Nuclear Power Plant. Three Severity Level III problems were cited for failing to adequately: 1) conduct control room activities; 2) maintain plant configuration control; and 3) conduct independent fuel dry cask storage activities. In addition, a single Severity Level III violation was cited for the licensee failing to take prompt corrective actions following the identification that the Technical Specifications for the safety-related service water system were non-conservative.